Phase 2: Design

Phase 2 of the Warren Avenue Bridge Multimodal project takes the eventual configuration – the recommended alternative – and begins the design process, enabling final cost estimates, scheduling and eventual project bidding. Check back in mid-2024 for the Phase 2 schedule.